368

Discipline/Origin

Drilling
No origin

Well

Shrek
6507/5-9 S, 6507/5-9 A

Date created

2019/10/22
2237 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Mud
Positive

Deepsea Nordkapp


What happened in Reservoir section:
Drilled 8 1/2″ section with 1.30 sg MW. Based on LWD data from 12 ¼” the predicted PP in the 8 ½” section was reduced and it was decided to drill the section with 1.30 sg MW to reduce the risk of losses and excessive overbalance. Max estimated PP reduced from 1.32 to 1.25 sg EMW.

What Was Planned

Drill 8 1/2″ hole with 1.38 sg MW.

What Was Learned

No problems encountered. Good decision.

What Actions Are Required

Received this information during operations. It is preferrable to be informed well beforehand as the entire well design is based on pore presssure prognosis.