396

Discipline/Origin

Drilling
No origin

Well

Shrek
6507/5-9 S, 6507/5-9 A

Date created

2020/03/13
2095 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Deepsea Nordkapp


Section N/A. What happened:
More slops backloaded than planned using Halliburton BSS. Amount of slop backloaded; 836 m3 + 200 m3 (Marine slop) = 1036 m3

What Was Learned

Equipment incl piping already installed on the rig, difficult to change out with Soiltech system

What Actions Are Required

Do a comparison of amounts from BSS and Soiltech. Less chemicals and less backload-> Less environmental footprint and lower costs.