Discipline/Origin

Drilling
No origin

Well

Shrek
6507/5-9 S, 6507/5-9 A

Date created

2019/10/22
2239 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
Positive

Deepsea Nordkapp


What happened in Production section:
12-/4” drilling – parameters went well.

What Was Planned

Drill 12 1/4″ sidetrack section.

What Was Learned

Drilled 12-1/4” in the same time frame as mainbore 12-1/4” and includes a 14 hrs stop to repair TDS connection, deviated wellbore, longer section and more stringer drilling.

What Actions Are Required

Use similar parameters in future.