What happened in Reservoir section:
Change of slips due to damage of pump in sub connection.
Due to the low ROP the pump in sub side connection was damaged in the PS30 slips.

What Was Planned

Usage of PS30 slips

What Was Learned

The PS30 slips have been replaced by the master bushing providing more clearance so reducing the DP/sub connection friction and wear.