WE Report

Lessons Learned

Lesson Learned





By: Drilling Supervisor

Report No.

552

Discipline/Origin

Drilling
No origin

Well

Schweinsteiger
6204/11-3

Date created

2020/09/21
1902 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Cut & pull
Negative

Borgland Dolphin


What happened in P&A:
Ran through BOP while jetting from top of BOP and landed out on top of wear bushing without hanging up. Pulled wear ushing free and hung up in lower annular on the way out. Had to work past lower annular.
Rig was all centered prior to RIH and had flushed through BOP at high rate using MPT with jetting sub below.

What Was Planned

Retrieve 9 5/8″ wear bushing

What Was Learned

Issue with annulars on Schaffer BOP’s even when running DQ MPT which is specially design to avoid hanging up in the BOP.

What Actions Are Required

Both annulars to be opened up during rig lay up in Feda Fjorden.