What happened in Production section:
Had to stop operations to fix a leak in TDX s-pipe connection – 2x o-rings.

What Was Planned

Drill 12 1/4″ sidetrack section.

What Was Learned

Leak resulted in only being able to pump at low rate. Hole cleaning had been good and allowed to pull with minimal circulation to the shoe.

What Actions Are Required

Odfjell to write Synergi and target similar potential weak links in the system and change such ‘Korean’ o-rings in advance.