WE Report

Lessons Learned

Lesson Learned





By: Drilling Engineer

Report No.

5919

Discipline/Origin

Drilling
No origin

Well

Norma
25/7-11 S

Date created

2023/09/10
818 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Mud
N/A

Deepsea Yantai


Section N/A. What happened:
Done as per plan. For the coring operations a new LCM pill was mixed. The LCM from the 8 1/2″ drilling was to coarse for the coring run (limitation of 1000 microns through coring assy).

What Was Planned

To mix a new LCM pill for the coring operation.

What Was Learned

Mud engineer informed that the coarse particles can be added close to pumping the LCM into well. Its potential in saving LCM chemical by not adding the coarse particles before its known that LCM is required. It can then suitable for different BHA’s.

What Actions Are Required

Evaluate not to add the coarse material into the LCM prior to LCM required to be pumped to make it suitable for different BHA’s.