By: Lars Solvang

Report No.

2201

Discipline/Origin

Completion
Own Experience

Well

Oselvar
A-1 H, A-2 H, A-3 HT2

Date created

2021/10/04
1524 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
Negative

Borgland Dolphin


What happened in P&A:
Clamps holding the control lines (polyoil clamps) had disintegrated.

What Was Planned

Pulling completion (tubing and control lines) after cutting the tubing just above the production packer.

What Was Learned

If these type of clamps have been used a holding clamp has to be used on surface to hold the control lines.

What Actions Are Required

Design and manufacturing of holding clamps ongoing and should be used.

If Polyoil (or similar) clamps are used additional related to this has to be included during the planning phase.