WE Report

Lessons Learned

Lesson Learned





No user selected

Report No.

254

Discipline/Origin

Drilling
No origin

Well

Songesand
35/4-2

Date created

2020/06/16
1999 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
Negative

Transocean Arctic


What happened in Surface section:
Used 2 x pup joints due to aim of +-2 m rathole. The 2 m pup was difficult to make up due to the space required for the BX elevator and the FMS.

What Was Planned

Make up casing w/pup joints

What Actions Are Required

Make the shortest pup length 3 m (or alt least 2.5 m abs. Min).