WE Report

Lessons Learned

Lesson Learned





By: Giacomo Bonomo

Report No.

6384

Discipline/Origin

Drilling
Own Experience

Well

Gnomoria
35/10-4 A

Date created

2024/06/11
543 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
Positive

COSLPromoter

What happened in Top hole:
RMR external adapter in place. Not possible to easily access profile and install VX gasket without lifting the SMO (suction module)

What Was Planned

Install VX Gasket on top of HPH before running stinger for cement job to protect the profile

What Was Learned

Possible to modify an old gasket to be able to run it offline with the ROV and the moonpool winch

What Actions Are Required

Drill 3 holes at 120 degrees in an old gasket, threading them for loctited eyebolts then running the gasket on ropes with a moonpool winch. The ROV then guided the gasket into position and released the winch and ropes. Saved 1,5 hrs.

Additional Documentation


Vx.pdf