WE Report

Lessons Learned

Lesson Learned





By: Lene Lomeland

Report No.

6759

Discipline/Origin

Drilling
No origin

Well

Falstaff
2/6-7 S

Date created

2024/09/23
439 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

What happened in Top hole:
The flowrate during cleanout of conductor was limited to 2000 lpm due to overflow of bird bath. 6”/8” hose connection.

What Was Planned

If a cleanout inside conductor was necessary to get to final TD a bird bath to be rigged up and the conductor cleaned out with a flowrate of 4000 lpm.

What Was Learned

Evaluate to add a second outlet at 90 deg. And section hose.

What Actions Are Required

Need to evaluate route of hoses back to pits if adding another hose. No easy alternative route without rig modifications.

EDITOR


CLOSE LL (testing)





New Lesson Learned