What happened in Top hole:
Due to lack of availability of the S200 hammer an S280 was used. During the majority of the driving operation more than 200 kJ was used piling down the conductor.

What Was Planned

Originally planned to use S200 hammer for the driving operations.

What Was Learned

Planned S200 hammer would probably been insufficient to get to final depth at this location due to harder formation than expected