Lesson Learned





By: Lene Lomeland

Report No.

6808

Discipline/Origin

Drilling
No origin

Well

Falstaff
2/6-7 S

Date created

2024/10/07
425 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
Negative

What happened in Top hole:
XT-22 tong was used – required machinery to be used in servie mode. This due to the tong did not fit in the “allowable area” for the ACS system. This required personnel to enter red zone to verify position of equipment and where the machines run slow enough to allow human operation with minimum risk of collision.

What Was Planned

Planned to use FA-1 tool. Expro XT-22 tong and BX-3 elevator as BU for running 20” casing.

What Was Learned

In view of need for manual intervention in service mode, not necessarily wrong to use belt tongs when using BX-3.