WE Report

Lessons Learned

Lesson Learned





No user selected

Report No.

174

Discipline/Origin

Drilling
No origin

Well

Brasse Appraisal
31/7-2 A

Date created

2017/09/28
2991 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Deepsea Bergen


What happened in Reservoir section:
When logging the 9 5/8” casing cement it was discovered during a repeat pass that the cement logs were inconsistent. Several passes were required before consistency between the logs was achieved.

What Was Planned

Log the 9 5/8″ cement

What Was Learned

The inconsistency between the logs could have been caused by gelled up mud.

What Actions Are Required

For future operations ensure repeat passes are performed until consistent bond log are achieved.

Also evaluate to perform USIT log in the beginning of the logging program to provide better time for onshore support to evaluate the logs and provide possible solutions.