Equipment
Negative

Borgland Dolphin


What happened in P&A:
As planned

What Was Planned

The plan was to move the URF to the slot next to the HXT that was been used.

What Was Learned

Cables from URF to HXTs should be so long that the URF can be left in one place for all wells.

What Actions Are Required

Order longer cables (ELF & HFL).