Section N/A. What happened:
Running cable through cut out in master bushing

What Was Planned

Running cable through cut out in the bowls in rotary

What Was Learned

Bowls with a cut out for cable running should not be used if no cables are run behind the slips in the rotary

What Actions Are Required

Bowls with a cut out for cable running should not be used if no cables are run behind the slips in the rotary