Report No.

185

Discipline/Origin

Logistics
No origin

Well

Serin
35/12-7

Date created

2019/02/05
2496 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Planning
Negative

Transocean Arctic


What happened in Reservoir section:
Stethoscope tool became primary means of taking pressure acquisition. Initial 14 pressure points were adjusted to 22 points.

What Was Planned

One SLB LWD engineer onboard for LWD operations.

What Was Learned

One LWD engineer was not enough, should have had two.

What Actions Are Required

For future operations the manning should be catered to the possibility of unpredictable changes to data acquisition requirements.