WE Report

Lessons Learned

Lesson Learned





No user selected

Report No.

205

Discipline/Origin

Drilling
No origin

Well

Kallåsen
35/12-6 S

Date created

2019/02/05
2496 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
Negative

Transocean Arctic


What happened in Production section:
Double float valves in shoe failed at around 900 m, still inside 13 3/8″ casing. Mud flowed back into the casing. Inserted casing circulating tool (CRTi) into casing and staged up circulation to 1500 lpm (800 lpm required to trip Auto Float function). Turned pumps on and off a few times. Floats worked fine after this.

What Was Planned

Run 9 5/8″ casing

What Was Learned

Unknown why it happened. Could be debris preventing float to close properly.