What happened in Intermediate section:
The deck tally was made without the mitsui numbers, so not possible to control check the lengths. When the casing was racked in derrick the first stands in the deck/racked tally used the deck numbers and the last used the land/mitsui numbers. Made it difficult and time consuming to make the running tally.

What Was Planned

Lay out casing and prepare tally for running the 13 5/8” casing.

What Was Learned

Make Rack Back casing DOP to avoid confusion.

What Actions Are Required

For future operations make R/B DOPs.