By: Drilling Engineer

Report No.

8283

Discipline/Origin

Drilling
No origin

Well

Tomcat
6501/10-1

Date created

2025/02/15
294 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
No classification

Deepsea Yantai


What happened in Reservoir section:
The BU float subs sent out for the operation had wrong/undesired OD. The BU float subs sent out was 8” OD. This creates high ECD in a 8 ½” hole section. The primary is 6 ¾”. For the potential sidetrack 6 ¾” BU float subs are ordered by DD.

What Was Planned

BU float planed out if needed to change out primary.

What Was Learned

For 8 ½” hole float subs should be 6 ¾” to limit the ECD effect.

What Actions Are Required

Check for next operation.