WE Report

Lessons Learned

Lesson Learned





No user selected

Report No.

169

Discipline/Origin

Drilling
No origin

Well

Brasse Appraisal
31/7-2 S

Date created

2017/09/28
2991 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Deepsea Bergen


What happened in P&A:
In DOP for pulling 9 5/8″ seal assembly, it was planned “Pick up with 3 ton overpull to check MPT engaged in seal assembly.” This was planned to do prior to closing annular. DQ engineer stated that this has been enough on other wells to pull seal assembly free with gas pressure below.

What Was Planned

Pull and retrieve the 9 5/8″ seal assembly

What Was Learned

3 ton overpull has been enough on other wells to pull seal assembly free with gas pressure below.

What Actions Are Required

Always close annular prior to pull on seal assembly, regardless the pull force.