By: Drilling Engineer

Report No.

5174

Discipline/Origin

Drilling
No origin

Well

Carmen
35/10-10S

Date created

2023/05/08
943 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Mud
N/A

Deepsea Yantai


What happened in Reservoir section:
Treated the mud for the second and subsequent runs circulating BU after cutting cores.

What Was Planned

Was not originally included in the DOP to treat the mud circulating BU after core.

What Was Learned

To include in DOP to treat mud if required circulating BU after coring, and to mix in the treatment pill in a small pit for accuracy. Also include in the checklist to ensure mud chemicals available in sack store to treat mud i needed. No crane lifts during cutting of core.

What Actions Are Required

To include in DOP to treat mud if required circulating BU after coring, and to mix in the treatment pill in a small pit for accuracy. Also include in the checklist to ensure mud chemicals available in sack store to treat mud i needed. No crane lifts during cutting of core.