WE Report

Lessons Learned

Lesson Learned





By: Drilling Supervisor

Report No.

1990

Discipline/Origin

Drilling
Own Experience

Well

Oselvar
A-3 HT2

Date created

2021/07/13
1608 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Borgland Dolphin


What happened in P&A:
Set 20″ EZSV at 694,5 m according to procedure. Tagged EZSV with 10 t. Pressured up to 50 bar, no pressure loss. Volume pumped 869 ltr. Volume pumped more than twice as much needed. Volume pumped correspond with volume needed to pressure test cement plug at 1754 deeper in well.

What Was Planned

Set 20″ EZSV at 694,5 m. Tag and pressure test to 50 bar with 1,75 sg OBM.

What Was Learned

Unable conclude on reason for leak on EZSV

What Actions Are Required

A scraper run was not performed and should be considered on future operations.