199

Discipline/Origin

Drilling
No origin

Well

Kallåsen
35/12-6 S

Date created

2019/02/05
2496 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
N/A

Transocean Arctic


What happened in Surface section:
The Franks CRTi tool was made up to top drive before csg entered OH. With the water depth and OH section length, the CRTi tool was taken off after only 200 m/2.5 hrs before the 18 3/4″ WH RT and 5 1/2″ landing string was made up.

What Was Planned

Run casing using CRTi tool

What Was Learned

It takes rig time to change to longer 15 ft bails which are required for running the CRTi and the CRTi itself.. Laying out CRTi after use will also leave csg. static in OH, increasing possibility to get stuck.

What Actions Are Required

If hole conditions are good after a wiper trip in next well, consider to NOT use the CRTi tool. Should be kept onboard only as back-up.