Lesson Learned





No user selected

Report No.

182

Discipline/Origin

Drilling
No origin

Well

Serin
35/12-7

Date created

2019/02/05
2496 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Transocean Arctic


What happened in Surface section:
When pumping drillwater out of the cement unit displacement tank, the pump sucked air, and delivered a pump efficiency less than 100%.

What Was Planned

Displace 13 3/8″ cmt job with cement pump.

What Was Learned

Could have been caused by foaming of the remains of cmt. Chemicals in DW. When cement was tagged, it was high, indicating that the pump had pumped around 1.3 m3 less than planned (10-11 m3 displacement).

What Actions Are Required

Add a little bit of defoamer into the displacement tank on the next job.