By: Drilling Engineer

Report No.

5844

Discipline/Origin

Drilling
No origin

Well

Carmen
35/10-10 A

Date created

2023/07/10
880 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Other
Negative

Deepsea Yantai


What happened in Production section:
Needed several trips with the tool up in the casing to cool it down.

What Was Planned

Logging the reservoir with a XPT tool.

What Was Learned

It is beneficial to use a HT XPT tool when the temperature in closing in on the 150 mark. The tool it self creates some temperature when running.

What Actions Are Required

Consider using HT XPT when predicted temperature is above approximately 140 degrees.