Deepsea Yantai


What happened in Reservoir section:
When coring 54 m cores, during connection the kick stand was removed a single joint was connected and the kick stand M/U to the single joint.

What Was Planned

To have one kick stand for HPHT coring operation.

What Was Learned

To have 2 kick stands when drilling an 54 m core, to avoid extra time B/O and M/U a single drill pipe prior to M/U the kick stand again.

What Actions Are Required

To evaluate to send out 2 kick stands when coring 54 m cores in HPHT conditions. Also ensure there is then enough side entry subs, pup joints and kelly cocks onboard for this.