Lesson Learned





No user selected

Report No.

379

Discipline/Origin

Drilling
No origin

Well

Shrek
6507/5-9 S, 6507/5-9 A

Date created

2019/10/22
2237 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Cement
Negative

Deepsea Nordkapp


What happened in Production section:
Cut of 9-5/8” casing close to/above uncemented weak sand interval (w/ minor 5% gas). Resulted in losses and also dropped/sunk cement job.

What Was Planned

Set KOP

What Was Learned

Result was losses to the uncemented interval when (trying to circulate) on POOH with casing and then the loss/sinking of the cement KOP down the annulus.
Evaluate to cement off such interval in previous 9-5/8” cmt job for barrier, if not evaluate cutting csg deeper to be closer to the zone and easier to plug it.

What Actions Are Required

Evaluate to set all VRP/Hi-Vis in OH (with CST) to give extra cmt support to try avoid sinking down annulus etc. If such is anticipated to be exposed – add LCM cmt chemicals.