WE Report

Lessons Learned

Lesson Learned





By: Lene Lomeland

Report No.

6760

Discipline/Origin

Drilling
No origin

Well

Falstaff
2/6-7 S

Date created

2024/09/23
439 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
N/A

What happened in Top hole:
During cleanout of conductor was filled with fluid. When drilling the drain hole the fluid poured out. Claxton personnel aware. The tool operated not electric.

What Was Planned

If necessary to get the conductor to TD a cleanout run was planned to decrease the friction inside the conductor for easier hammering the conductor further down. The cleanout was planned to be drilled with SW and sweeps.

What Was Learned

Make personnel involved that if cleanout is performed the conductor will be filled with fluid.

What Actions Are Required

Include as a note in the DOP