What happened in Top hole:
Removed one slip element to allow passage of Frelok hydraulic line below RF without damage.

What Was Planned

Run hydraulic lines with 20” Frelok joint to be able to disconnect from the Frelok pin on 20” casing.

What Was Learned

Correct way to ensure no damage to hydraulic line.

What Actions Are Required

Repeat in future.