What happened in Top hole:
Difficulties marking LPWHH as per DOP on deck prior to running same.

What Was Planned

Markings on LPWHH.

What Was Learned

LPWHH should be delivered with a marking 1,5 m from top for optimum stick up. Preferred with a different colour than the meter marks.
Also have a verification mark 0,7 m for showing when the SMO is fully landed, when use of SMO is planned.
These markings are very handy when in operation, but it is sometimes difficult to get access to housing to actually set the markings. Safer to do on base or supplier.