Report No.

302

Discipline/Origin

Drilling
No origin

Well

Canela
6507/7-16 S

Date created

2019/01/07
2526 days ago

Project Phase

Planning
Project Phase

LL Type/Classification

Sidetrack design
N/A

Island Innovator


Section N/A. What happened:
Perform sidetrack casing design using PP and FG based on planned sidetrack trajectory.

What Was Planned

Sidetrack casing design

What Was Learned

Did not include PP/FG for sidetrack casing design based on deviated well profile in mainbore geomechanical study. Would have resulted in a lot of last minute work completing sidetrack design based on updated geomechanical model including data from mainbore operations.

What Actions Are Required

Include preliminary sidetrack PP/FG and MW recommendation in mainbore geomechanical study to ensure sufficicent time for performing sidetrack casing design.