What happened in Run BOP:
BOP had to be pulled just before landing due to grouting job necessary for conductor. Not able to hang off BOP in trip saver due to trip saver adapter not available on the rig or onshore.

What Was Planned

Trip saver to hang of BOP not sourced.

What Was Learned

Evaluate to source trip saver adapter, escpecially in winter ops.

What Actions Are Required

See learning.