WE Report

Lessons Learned

Lesson Learned





By: Karina Helle

Report No.

1228

Discipline/Origin

Drilling
Experience Transfer Meeting

Well

Oselvar
A-1 H, A-2 H, A-3 HT2

Date created

2012/05/11
4958 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Borgland Dolphin


Section N/A. What happened:
DONG handover documentation: When drilling 8-1/2″ with 9-1/4″ underreamer a section of the hole was not underreamed due to underreamer malfunction. This was only discovered because the underreamer wore out further down the section and a check run was made with a new underreamer all they way (the calliper in the BHA is positioned between bit and UR).

External Actions

When circulating at TD, position string so calliper can verify ID’s above and below UR shoulder. If tight sections are experienced when POOH then evaluate to take calliper readings (realtime or memory) to confirm ID / that section has been underreamed.