What happened in Intermediate section:
It was run according to tally.

What Was Planned

The 9 7/8″ Casing was planned with two different connections. Needed XO from Vam 21 and Vam Top and a XO for the hgr. The Primary and BU XO sent out was 6 m different in length

What Was Learned

To have the BU XO the same length as the Primary. If one of the XO needs to be changes out running casing the casing string would suddenly be 6 m longer due to BU being 6 m longer.

What Actions Are Required

Send out BU XO same length as Primary