Equipment
Negative

Transocean Arctic


What happened in Reservoir section:
Noticed several times that “slugs” of cuttings would reach the shakers for no good reason.

What Was Planned

Circulate through 20″ casing with 5 1/2″ DP

What Was Learned

There is large annular space for 10 m between inside of 20″ extension joint, and the outside 5 1/2″ DP. The low flowrate of only 800 lpm and very thin mud (3 RPM reading @ 50 deg C of only 4-5), hole cleaning was poor in this area. Could be that cuttings accumulated inside the 20″ extension joint and caused high ECD-

What Actions Are Required

For future wells with similar flowrates, it would be smart to install some kind of “inner liner” inside the joint making the ID similar to the ID of the 9 5/8″ casing.