What happened in Surface section:
The centralizers was placed close to the bottom of the casing joint and was difficult to handle on the drill floor with the monkey tail.

What Was Planned

To run casing with centralizers

What Was Learned

To place the centralizers approx. one meter longer up, towards middle of the joint, for easier handling on rig floor

What Actions Are Required

To inform the service company delivering the centralized joints to place the centralizer further up from the pin (0.5-1 m).