WE Report

Lessons Learned

Lesson Learned





By: Drilling Engineer

Report No.

5859

Discipline/Origin

Drilling
Own Experience

Well

Norma
25/7-11 S

Date created

2023/07/30
861 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Positive

Deepsea Yantai


What happened in Top hole:
Drawwork in landing mode. No change in hookload while cementing and displacing.

What Was Planned

Drawwork in landing mode during 20″ casing cement job.

What Was Learned

Good practice to have the drawwork in landing mode when using an inner-string stinger into the float to avoid it stinging out due to heave etc.

What Actions Are Required

Have the drawwork in landing mode when using an stab-in stinger for 20″ casing job.