WE Report

Lessons Learned

Lesson Learned





No user selected

Report No.

230

Discipline/Origin

Drilling
No origin

Well

Kallåsen
35/12-6 S

Date created

2019/02/07
2495 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
Negative

Transocean Arctic


What happened in P&A:
Both primary and secondary cutter assembly was delivered with 6 5/8″ handling subs, torqued up to 50 klbs. Transocean did not have 6 5/8″ inserts for BX frame for elevator onboard. This was discovered by AD & PTP around 4 hours before assemblies were to be picked up.

What Was Planned

Cut 9 5/8″ casing

What Was Learned

Had to mobilize inserts from town with extra chopper. All other Schlumberger drilling BHA modules are normally delivered with 5 1/2″ lift subs.

What Actions Are Required

Ensure Slb send out BHA modules with 5 1/2″ lift subs.