WE Report

Lessons Learned

Lesson Learned





No user selected

Report No.

339

Discipline/Origin

Drilling
No origin

Well

Shrek
6507/5-9 S, 6507/5-9 A

Date created

2019/10/21
2239 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Deepsea Nordkapp


What happened in Top hole:
Rigged up for conductor running, extra 20 ft mobilized for the operation.

What Was Planned

Running 30″ conductor using 20 ft bails on elevator in TDX.

What Was Learned

Due to flexibility of the 15 ft bails and the installment of 30″ side doors there was no need to change bails to 20 ft.

What Actions Are Required

Check with drilling contractor if it existing bails needs changing out or not.