By: Karina Helle

Report No.

1217

Discipline/Origin

Drilling
Experience Transfer Meeting

Well

Oselvar
A-1 H, A-2 H, A-3 HT2

Date created

2012/03/24
5005 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Casing
Negative

Borgland Dolphin


What happened in Production section:
DONG handover documentation:
When circulating prior to cementing initial pressure was 79 bar / 1500 lpm, this gradually declined to 11 bar. MW in returns was up to 1.84 sg for some time. After trouble shooting on surface with out finding any reasons for the low pressure it was observed that DP string was on strong vacuum. Circulation continued and pressure increased gradually and stabilized at 50 bar / 1500 lpm. MW out was as low as 1.65 sg indicating bartie sag inside casing during casing run. Mud low end rheology had been kept low due to swabbing concerns.

What Was Learned

The balance between rheology to support barite versus swabbing when POOH is delicate. Recommendation is to be more aware that variations in circulating pressures could be caused by this as circulating pressure loss is so low that variations in MW can have serious effects on pump pressure.