WE Report

Lessons Learned

Lesson Learned





No user selected

Report No.

198

Discipline/Origin

Drilling
No origin

Well

Kallåsen
35/12-6 S

Date created

2019/02/05
2496 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Transocean Arctic


What happened in Surface section:
Had trouble making up casing correctly due to movement of casing in slips. Had to back out several joints and re-try.

What Was Planned

Run casing

What Was Learned

A tugger wire in the moonpool helped stabilize and centre the casing hanging down into the sea.

What Actions Are Required

Consider sending out 2-3 no-cross coupling joints for making up casing with the shoetrack in the splash zone as it might help reduce the time spent backing out and re-making joints caused by pipe movement/VAM 21 alignment issues.