WE Report

Lessons Learned

Lesson Learned





By: Drilling Engineer

Report No.

2303

Discipline/Origin

Logistics
Own Experience

Well

Fat Canyon
6306/3-1 S

Date created

2021/11/14
1483 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
Negative

Borgland Dolphin


What happened in Production section:
The BHA was sent from Stavanger to Kristiansund, and after screening the loadout list from Schlumberger it was found a missing Sonicscope. SLB had therefore to send a new dedicated trailer to KSU with Sonic and we already had a very tight weather window. We made it in the end, with a margin of ± 2 hrs.

What Was Planned

Send out new 12 1/4″ BHA for the technical ST.

What Was Learned

That it is important to look over the loadout list for special items that is critical.

What Actions Are Required

Always look through the loadout lists for equipment to make sure what’s required is sent.