WE Report

Lessons Learned

Lesson Learned





No user selected

Report No.

277

Discipline/Origin

Drilling
No origin

Well

Rungne
30/6-30

Date created

2019/01/01
2531 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Negative

Transocean Arctic


What happened in Reservoir section:
Made first connection on core BHA #3. This 64 m core BHA would require 2 connections on bottom. During first connection with corehead on bottom (1 m heave), the hydraulic jar fired with the string in slips. Pipe did not move in slips, but shock could be felt on rigfloor. This action could possibley fracture & damage core downhole. Decided to break core and make second connection off bottom.

What Was Planned

Coring

What Was Learned

NA

What Actions Are Required

Should investigate if a hydraulic jar isi the best option when lpanning long core BHA which requires connection made off bottom. Alternatively, don’t make connection on bottom.