Lesson Learned





By: Drilling Engineer

Report No.

5842

Discipline/Origin

Drilling
No origin

Well

Carmen
35/10-10S

Date created

2023/06/20
901 days ago

Project Phase

Planning
Project Phase

LL Type/Classification

Equipment
N/A

Deepsea Yantai


What happened in Intermediate section:
Had some stringer in the bottom of the 12 1/4″ Section and had to work the csg hgr w/seal assy up and down in the rotary to get the casing to TD.

What Was Planned

To run the seal assembly in the same run as the 9 7/8″ casing.

What Was Learned

Run seal assembly in separate run. High potential for damaging seal assembly and consequently junk in WH

What Actions Are Required

Run seal assembly in separate run. High potential for damaging seal assembly and consequently junk in WH