WE Report

Lessons Learned

Lesson Learned





No user selected

Report No.

239

Discipline/Origin

Well test
No origin

Well

Grosbeak West
35/11-21 S

Date created

2020/06/16
2001 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
N/A

Transocean Arctic


What happened in Reservoir section:
Only able to pump with 2500 lpm while cleaning up 9 5/8″ casing and displacing from OBM to brine.

What Was Planned

9 5/8″ clean up

What Was Learned

A circulating sub in the 5 1/2″ DP above the 7*” liner top would have enabled us to pump with 3500 lpm and high pressure.

What Actions Are Required

Consider using a circulating sub in future operations to allow for better clean up.