What happened in Top hole:
The weight of the LPWHH was 15.4 ton w/o handling clamp and 17.2 tons with the handling clamp.

What Was Planned

Lift the 30×36″ LPWHH.

What Was Learned

– Limit for heavy lift is 17 ton.
– Had to turn the LPWHH 180 degrees when lifting to DF.
– If the handling clamp shall be installed on pipe deck the LPWHH had to be tuned the opposite way of the DF.

What Actions Are Required

Activate AT for heavy lift prior to take LPWHH on board.
The housing needs to be laid out on deck with the housing orientating to aft