By: Drilling Supervisor

Report No.

2005

Discipline/Origin

Drilling
Own Experience

Well

Oselvar
A-1 H, A-2 H, A-3 HT2

Date created

2021/07/28
1592 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Positive

Borgland Dolphin


What happened in P&A:
Volume required was larger that expected for first 20 bar. However from 20 bar to 50 bar the volume required was consistent with the volume above the EZSV only. The bleed off volume was also consistent with bleeding down from above the EZSV only.

What Was Planned

Pressure test 20″ EZSV to 50 bar

What Was Learned

EZSV did not fully seal/energize initially.

What Actions Are Required

Pump at higher rate to help energize the EZSV element (can set the pressure kick-out to 55 bar to prevent over-pressuring casing above EZSV).

What Was Done

Refer to attached email and test chart.