WE Report

Lessons Learned

Lesson Learned





By: Stein-Petter Slatlem

Report No.

8200

Discipline/Origin

Drilling
No origin

Well

Kjøttkake
35/10-13

Date created

2025/02/02
307 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
No classification

Deepsea Yantai


What happened in Surface section:
Difficulties spinning in and M/U 7” Tubing.

What Was Planned

M/U 7” RMR return line.

What Was Learned

The tubing is very worn. The coating fills the dies on the CSG-tong, causing the OWS operator or RN to enter red zone to brush dies. We end up spending a lot of time to M/U each connection.
Due to that the jaws on a CSG-tong is fixed, we tend to struggle after the first turns with the tong.

What Actions Are Required

Change out tubing or at least do a proper check for wear and tear. Differences in OD require changing out jaws etc. time consuming and a lot of traffic in red zone.