Lesson Learned





By: Sander Schaathun

Report No.

5115

Discipline/Origin

Drilling
No origin

Well

Eirik (OMV)No well selected

Date created

2023/03/30
982 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Casing
No classification

Deepsea Yantai


What happened in Production section:
If we are leaning to one of the sides it is easy to hang up in something which can result in a misformed seal assembly (which will not seal properly) and tearing of the outer lock ring.

What Was Planned

Aligned directly over the well center before going through BOP with Casing hanger and 18 Z” Seal assembly with outer lock ring.

What Was Learned

If hanging up – POOH and remove SA and run separately. Evaluate to run and install seal assy separately when running long and heavy casing strings in shallow water depths.

What Actions Are Required

Mark in RAP to verify bullseye on BOP and flex joint (bridge)

Additional Documentation


LL-from-Eirik-OMV-3.pdf